Shekou PRC - Bins
Blending silos Malaysia |
Using
experience gained from our Guangzhou tunnel lining slipform project,
CSM supplied Slipform Equipment and managed the construction of a 18
silo block and a 100 bin block in Shekou, PRC. A very high standard
of finish was achieved on this project.
Cement Works- Bahau, Malaysia CSM
Slipform and CSM Heavy Lift Technologies
were combined to construct the massive clinker silo at Bahau Malausia.
The 35M diameter silo was slipformed from the foundation to roof level,
making this the largest diameter slipform in Malaysia. The 300T steel
roof designed and fabricated by CSM was erected at ground lavel and
raised up in one heavy lift. In addition, two sets of twin 19 meter
diameter silos were also engineered and constructed by CSM. |
Shekou PRC - Silos
Cement silos Malaysia |