Inspection and Maintenance Works
Project
and Client |
Height
in Metres |
Contract |
Flue
Type |
Number
of Flues/Diameter Metres |
|
| Inspection Consultancy | Maintenance | ||||
Singapore
Refining Co Pte Ltd |
130 |
I |
M |
4"
Brick |
1x5.0M |
| Singapore
Refining Co Pte Ltd UTILITIES STACK Inspection and maintenance, including partial relining and replacement of top of windshield. |
130 |
I |
M |
4"
Brick |
1x5.5M |
| Singapore
Refining Co Pte Ltd VISBREAKER STACK Inspection and repair includingpartial relining, and replacement of cap |
130 |
I |
M |
9"
Brick |
1x6.5M |
| Singapore
Refining Co Pte Ltd HCU STACK Inspection and repair including partial relining and replacement of cap. |
130 |
I |
M |
9"
Brick |
1x6.0M |
| Singapore
Refining Co Pte Ltd CRU STACK Inspection and maintenance, including partial relining and replacement or top of cap. |
130 |
I |
M |
9"
Brick |
1x6.0M |
| Singapore
Refining Co Pte Ltd 600°SULPHUR STACK Repair of windshield and lining after an internal fire(second fire) |
130 |
I |
M |
9"
Brick |
1x5.0M |
| Tenaga
Nasional Sdn Bhd PRAI POWER STATION Partial Liner replacement to Flue 4 |
140 |
I |
M |
AR.B |
2x3.1M |
| Tenaga
Nasional Sdn Bhd PRAI POWER STATION Partial Liner replacement of Flue 6 |
140 |
I |
M |
AR.B |
2x3.1M |
| Tenaga
Nasional Sdn Bhd PRAI POWER STATION Pot strengthening and maintenance works to Roof |
140 |
I |
M |
AR.B |
2x3.1M |
Tenaga
Nasional Sdn Bhd |
119 |
I |
M |
AR.B |
1x5.0M |
| Tenaga
Nasional Sdn Bhd PRAI POWER STATION Flue 5- Partial Liner replacement Supply & installation of new Entry Duct |
119 |
I |
M |
AR.B |
1x3.1M |
| Singapore Refining Co Pte Ltd HCU STACK Internal and External Inspection. Replacement of Bricks at 3rd and 4th Bracket and Coring of concrete windshield. |
130 |
I |
M |
9"
Brick |
1x6.0M |
| Singapore Refining Co Pte Ltd RCC COMMON STACK Inspection of Internal Face of Liner, including minor repair of refractory. |
130 |
I |
M |
Carbon
Steel with Refractory |
1x4.7M |
| Singapore Refining Co Pte Ltd 760° C CDU II STACK Inspection of Internal Face of Liner. |
130 |
I |
M |
Corten
with Refractory |
1x2.6M |
| Singapore Refining Co Pte Ltd HEATER STACK Extension of Stack 30m to 40m in total height. |
40 |
I |
M |
Refractory |
1x2.0M |
| Singapore Refining Co Pte Ltd RCC UTILITY STACK Ductwork Diversion from existing Boiler 1001-HA, HB, HC to Utility Stack 1085-L |
130 |
I |
M |
Steel |
1x1.65M with Refractory 3x2.1M 1x2.3M |
| Taichung Power Station Post Earthquake inspection and consultancy |
250 |
I |
Steel
& C276 |
8x6.0M |
|
| Tenaga Nasional Sdn Bhd PRAI POWER STATION Flue 4, 5 & 6 Replacement |
119 |
I |
C |
Brick |
3x3.1M |
| Tenaga Nasional Sdn Bhd PRAI POWER STATION Site Inspection following explosion/fire |
119 |
D |
|
Brick |
3x3.1M |