| SPECIAL PROJECTS | T = Turnkey C = Construction only |
| Guangzhou Pump Storage Power Station-Phase I | --0.5M
to 1.0M thick Sipform concrete lining to two 8M dia 50 Deg. Inclined penstocks-346
and 284 metres long. --Supply and operation of 2 x 8 ton by 100 metres per minute High Speed Winches. --Suppy and operation of 2 x 50 degree inclined slipform rigs. --Suppy and operation of 2 drilling & grouting platforms. |
Feb 91-Jul 92 | |
| Guangzhou Pump Storage Power Station-Phase II | Refurbishment of Phase I equipment. Design upgrade and supervision of works. | Mar 95-May 97 | D |
| Hamworthy Combustion Engineering Co. | Design, Manufacture and Erection of a Noxious Gas Incinerator for PCS Singapore. | Nov 95-Dec 96 | D |
| Halla Engineering & Heavy Industries Ltd. | Blending, Clinker & Cement Silo Works Bahaw Malaysia | Jun 96-Feb 97 | D + C |
| Lamsoon China Holdings Ltd. | Slipform of 140 Silos + Bins to the Shekou Lamsoon Flour Mills Project. | Nov 92-Dec 93 | C |
| Petrochemical of Singapore | Upgrading steel stack. | Sep 95-Oct 95 | T |
| Shin-Fong Taiwan Power | Slipform of three 58M high 25M dia stacks (Design & Supervision) | Sep 95-Jan 96 | C |
| Singapore Refining Co Pte Ltd | Provision of specification and contract documents for structural repairs. | Aug 95-May 96 | D |
| Shell Eastern Pte Ltd, Pulau Bukom | Preparation of a chimney repair safety manual. | Dec 89-Jan 90 | D |
| Tenaga Nasional Bhd Prai Power Station |
Boiler No 4 Demolition of Old and installation of a New Brick Flue | Jan 94-Jan 95 | T |
| Tenaga Nasional Bhd Prai Power Station |
Boiler No 5 & 6 Demolition of Old and installation of a New Brick Flue | Mar 95-Jan 96 | T |
| Tenaga Nasional Bhd Prai Power Station |
Comprehensive inspection, preparation of specification for the rehabilitation and relining of the 3 flue, 140 metre height stack prior to gas operation of the station. | Apr-96 | T |
| Tenega Nasional Bhd Prai Power Station |
Extensive repair following at fire in the chimney caused by incomplete fuel buming in the boiler. | Jan 00-Aug 00 | T |
| Formosa Chemicals & Fibre Corp | 35M Ash Silo -foundation + Silo works. | Nov 01-Mar 02 | C |
| Formosa Heavy Industries Corporation | 120Meter diameter Salt Dome Structure --Design and construction of civil works to a 120M diameter salt storage dome on reclaimed land immediately next to the sea. Works comprise Stacker Reclaimer machine foundations. Conveyor tunnel system and 19.5M high perimeter retaining wall. |
Dec 01-Jun 04 | T |
| Formosa Chemicals & Fibre Corp | 35M Ash Silo -foundation + Silo works. | Nov 021-Mar 03 | C |
| Formosa Heavy Industries Corporation Hwa Ya Power Station |
96M Dia Coal Dome. | Nov 02-Jun 04 | T |
| Guangdong Pumped Storage Company Ltd Huizhou Pump Storage Power Station |
50 degree inclined 8.0M diameter penstock tunnel concrete linings to A and B station | Apr 05-Jun 07 | T |