SPECIAL PROJECTS
D = Design Only
T = Turnkey
C = Construction only
CLIENT
PROJECT
CONTRACT PERIOD
CONTRACT STATUS
Guangzhou Pump Storage Power Station-Phase I --0.5M to 1.0M thick Sipform concrete lining to two 8M dia 50 Deg. Inclined penstocks-346 and 284 metres long.
--Supply and operation of 2 x 8 ton by 100 metres per minute High Speed Winches.

--Suppy and operation of 2 x 50 degree inclined slipform rigs.

--Suppy and operation of 2 drilling & grouting platforms.
Feb 91-Jul 92  
Guangzhou Pump Storage Power Station-Phase II Refurbishment of Phase I equipment. Design upgrade and supervision of works. Mar 95-May 97 D
Hamworthy Combustion Engineering Co. Design, Manufacture and Erection of a Noxious Gas Incinerator for PCS Singapore. Nov 95-Dec 96 D
Halla Engineering & Heavy Industries Ltd. Blending, Clinker & Cement Silo Works Bahaw Malaysia Jun 96-Feb 97 D + C
Lamsoon China Holdings Ltd. Slipform of 140 Silos + Bins to the Shekou Lamsoon Flour Mills Project. Nov 92-Dec 93 C
Petrochemical of Singapore Upgrading steel stack. Sep 95-Oct 95 T
Shin-Fong Taiwan Power Slipform of three 58M high 25M dia stacks (Design & Supervision) Sep 95-Jan 96 C
Singapore Refining Co Pte Ltd Provision of specification and contract documents for structural repairs. Aug 95-May 96 D
Shell Eastern Pte Ltd, Pulau Bukom Preparation of a chimney repair safety manual. Dec 89-Jan 90 D
Tenaga Nasional Bhd
Prai Power Station
Boiler No 4 Demolition of Old and installation of a New Brick Flue Jan 94-Jan 95 T
Tenaga Nasional Bhd
Prai Power Station
Boiler No 5 & 6 Demolition of Old and installation of a New Brick Flue Mar 95-Jan 96 T
Tenaga Nasional Bhd
Prai Power Station
Comprehensive inspection, preparation of specification for the rehabilitation and relining of the 3 flue, 140 metre height stack prior to gas operation of the station. Apr-96 T
Tenega Nasional Bhd
Prai Power Station
Extensive repair following at fire in the chimney caused by incomplete fuel buming in the boiler. Jan 00-Aug 00 T
Formosa Chemicals & Fibre Corp 35M Ash Silo -foundation + Silo works. Nov 01-Mar 02 C
Formosa Heavy Industries Corporation 120Meter diameter Salt Dome Structure
--Design and construction of civil works to a 120M diameter salt storage dome on reclaimed land immediately next to the sea. Works comprise Stacker Reclaimer machine foundations. Conveyor tunnel system and 19.5M high perimeter retaining wall.
Dec 01-Jun 04 T
Formosa Chemicals & Fibre Corp 35M Ash Silo -foundation + Silo works. Nov 021-Mar 03 C
Formosa Heavy Industries Corporation
Hwa Ya Power Station
96M Dia Coal Dome. Nov 02-Jun 04 T
Guangdong Pumped Storage Company Ltd
Huizhou Pump Storage Power Station
50 degree inclined 8.0M diameter penstock tunnel concrete linings to A and B station Apr 05-Jun 07 T